Refine your search:     
Report No.
 - 
Search Results: Records 1-20 displayed on this page of 129

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Development of semiconductor switches for high-power crowbar circuits for J-PARC accelerator

Ono, Ayato; Takayanagi, Tomohiro; Fuwa, Yasuhiro; Shinozaki, Shinichi; Ueno, Tomoaki*; Horino, Koki*; Sugita, Moe; Yamamoto, Kazami; Kinsho, Michikazu; Ikoma, Naoya*; et al.

Proceedings of 20th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.871 - 876, 2023/11

In J-PARC, an ignitron is used for the crowbar device of the klystron power supply to excite the RF acceleration voltage in a Linac cavity. Mercury, that is used in the ignitron, would be prohibition of use in the future due to environmental protection. Therefore, we designed a semiconductor crowbar switch for short-circuit protection of klystron using a MOS gate thyristor. We have manufactured an oval-type board module that realizes an operating output of 3kV, 40kA, and 50us per board. Because a high voltage of 120 kV is applied on each board, we adopted a self-power supply method to supply a electricity for the control system. This method can create the electricity from a high-voltage DCDC converter. We confirmed the operating performance on a 1/2 scale (60 kV, 40 kA) of the voltage in the existing ignitron system (120 kV, 40 kA). We also studied a test circuit in a higher voltage range of more than 90 kV. Our latest result is well promising for an alternative system of ignitron.

Journal Articles

Waveform pattern control of paint bump power supply for J-PARC RCS using machine learning

Sugita, Moe; Takayanagi, Tomohiro; Ueno, Tomoaki*; Ono, Ayato; Horino, Koki*; Kinsho, Michikazu; Oguri, Hidetomo; Yamamoto, Kazami

Proceedings of 20th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.519 - 522, 2023/11

In J-PARC RCS, paint bump magnets are used to displace the beam orbit during paint injection, which produces a high intensity beam. A pattern of command current and command voltage can be used to create an output current waveform that varies the beam orbit over time. The accuracy of beam orbit control is determined by the shape difference between the command current and output current waveforms. In the current paint pattern adjustment, a deviation of $$pm$$1% or less is achieved by manual adjustment after using software that adjusts the pattern according to the response function of the power supply control. However, we would like to reduce the adjustment time. In addition, since the accuracy of paint injection is determined by the adjustment system of the paint magnet power supply, we would like to achieve output current deviation 10 times more precise than before to reduce beam loss. An analytical model of the load-side impedance is necessary to create a high-precision paint pattern, but it is very difficult to construct an analytical model because the load-side impedance changes in a time-varying nonlinear paint pattern. We used machine learning to adjust the output pattern of the paint pattern and achieved a deviation of less than $$pm$$0.5% through repeated learning. This presentation will report on the current status of the system and its prospects.

JAEA Reports

Precautions of capacitor inspection and its treatment based on the PCB Special Measures Law

Ono, Ayato; Takayanagi, Tomohiro; Sugita, Moe; Ueno, Tomoaki*; Horino, Koki*; Yamamoto, Kazami; Kinsho, Michikazu

JAEA-Technology 2022-036, 31 Pages, 2023/03

JAEA-Technology-2022-036.pdf:8.77MB

In the Japan Atomic Energy Agency (JAEA), many electrical facilities such as power receiving equipment and power supply units are installed in experimental facilities such as the Nuclear Science Research Institute (NSRI) and the Japan Proton Accelerator Research Complex (J-PARC). However, some facilities have been in operation for more than half a century since they were manufactured, some have already been closed or deactivated, and others are still in operation while replacing parts and taking other aging measures. In these facilities, materials that were used because of their excellent properties at the time of manufacture are now designated as hazardous substances and require special management when disposed of. One of them is polychlorinated biphenyl (PCB). PCB were used in a very wide range of fields because of their stability against heat, high electrical insulation, and chemical resistance. However, it was found that PCB have persistent properties and may cause damage to human health and the living environment, and the government has enacted the "Act on Special Measures for Promotion of Proper Treatment of PCB Wastes (PCB Special Measures Law)" to promote reliable and proper disposal. JAEA has almost completed the excavation survey of high-concentration PCB waste and is in the process of excavating low-concentration PCB waste. However, there are still new relevant items to be discovered. This report summarizes and reports the knowledge necessary for identifying PCB waste and points to be noted when handling capacitors, etc., based on examples of actual disassembly and investigation work conducted on power supply units and other electrical equipment, such as capacitors attached to power supply units, etc.

Journal Articles

Development of semiconductor switches for high-power crowbar circuits

Ono, Ayato; Takayanagi, Tomohiro; Fuwa, Yasuhiro; Shinozaki, Shinichi; Ueno, Tomoaki*; Horino, Koki*; Sugita, Moe; Yamamoto, Kazami; Kinsho, Michikazu; Ikoma, Naoya*; et al.

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.395 - 399, 2023/01

At J-PARC, an ignitron is used for the crowbar device of the klystron power supply for high-frequency acceleration of a linear accelerator. Ignitron uses mercury, which is of limited use worldwide, and is expected to be discontinued in the future. Therefore, we designed a semiconductor crowbar switch for short-circuit protection of klystron using a MOS gate thyristor. We have manufactured an oval-type board module that realizes an operating output of 3 kV, 40 kA, and 50 $$mu$$s per board. For the control power supply to each board module assuming a high voltage of 120 kV, we adopted a self-power supply method that creates a control power supply with a high-voltage DCDC converter from the voltage shared and charged by each board module. It was possible to confirm the operating performance on a 1/2 scale (60 kV, 40 kA) against the voltage of the existing equipment (120 kV, 40 kA) by connecting twenty oval board modules in series. The output test result will be reported.

Journal Articles

Semiconductor pulse power supplies for accelerators at J-PARC

Takayanagi, Tomohiro; Ono, Ayato; Fuwa, Yasuhiro; Shinozaki, Shinichi; Horino, Koki*; Ueno, Tomoaki*; Sugita, Moe; Yamamoto, Kazami; Oguri, Hidetomo; Kinsho, Michikazu; et al.

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.242 - 246, 2023/01

At J-PARC, semiconductor short pulse power supplies to replace kicker power supplies and semiconductor long pulse power supplies to replace klystron power supply systems are under construction. We have fabricated a 40kV/2kA/1.2$$mu$$s unit power supply that employs a linear transformer drivers (LTD) system for kickers. Currently, we are working on a high voltage insulating cylinder insulator that suppresses corona discharges using only the insulator structure, without using insulating oil. In addition, the MARX system was adopted for klystron power supply system. A main circuit unit for 8kV/60A/830$$mu$$s rectangular pulse output and an 800V/60A correction circuit unit that improves the flat top droop from 10% to 1% were manufactured. Furthermore, a 2.2kV/2.4kW high voltage SiC inverter charger has been fabricated for this MARX power supply. The presentation will report the evaluation results of each test and prospects for semiconductor pulse power supplies.

Journal Articles

Construction of low-jitter circuit for new kicker power supply using next-generation power semiconductor

Oda, Kodai; Takayanagi, Tomohiro; Ono, Ayato; Horino, Koki*; Ueno, Tomoaki*; Sugita, Moe; Morishita, Takatoshi; Iinuma, Hiromi*; Tokuchi, Akira*; Kamezaki, Hiroaki*; et al.

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.610 - 614, 2023/01

Kicker system is being used to kick the accelerated 3 GeV beam into the transport lines in RCS of J-PARC. The current kicker power supply applies thyratrons to discharge switches. We are developing a new kicker power supply using next-generation power semiconductors. The timing of the semiconductor switch operation is determined by the input of an external trigger signal. Large timing jitter causes unstable output pulses and beam loss due to beam orbit deviate from reference orbit. Therefore, a low jitter circuit that achieves high repeatability of 2 ns or less will be developed for the new kicker power supply. A prototype trigger generator has been fabricated, and jitter has been evaluated. The results of the evaluation test and the circuit configuration plan for reducing jitter will be reported.

JAEA Reports

Guideline and cautionary points for accelerator system maintenance

Ono, Ayato; Takayanagi, Tomohiro; Sugita, Moe; Ueno, Tomoaki*; Horino, Koki*; Yamamoto, Kazami; Kinsho, Michikazu

JAEA-Technology 2021-044, 53 Pages, 2022/03

JAEA-Technology-2021-044.pdf:43.7MB

The 3-GeV rapid cycling synchrotron of Japan Proton Accelerator Research Complex (J-PARC) uses a large number of electromagnet power supplies in order to manipulate a high-intensity beam of 1 MW. These devices have been specially developed to meet the requirement to achieve acceleration of the 1-MW proton beams. Because J-PARC has been in operation for 10 years, we have to replace many parts and equipments due to failures caused by age-related deterioration. J-PARC accelerator system supplies the beams for many users, and we have to recover it as soon as possible when a trouble occurs. Therefore, if the trouble can be prevented before it happens, reduction of the user beam time can be minimized. Furthermore, it enables us to reduce additional work for operators. Maintenance is important to keep the equipments in a normal state, and makes it possible to extend the life of the equipments by detecting and maintaining the faulty parts and the aged deterioration parts at an early stage. Since all the devices requires the maintenance, there are a wide variety of maintenance methods. Some works are carried out by the J-PARC members, and some are performed by outsourcing. Ensuring safety and protecting workers are the most important issues in maintenance work. Therefore, J-PARC has rules for safety work. All workers in J-PARC have to learn and follow the rules. In addition, various ideas are being considered to enable safe and efficient work by devising ingenuity in each work. We also elaborate various ideas and processes for safe and efficient work according to the individual work conditions. In this report, we summarize the guideline and cautionary points during maintenance based on the actual case of maintenance and inspection work of the horizontal shift bump electromagnet power supply.

Journal Articles

Development of semiconductor clover switch for short-circuit protection of Klystron for J-PARC accelerator

Ono, Ayato; Takayanagi, Tomohiro; Ueno, Tomoaki*; Horino, Koki*; Yamamoto, Kazami; Kinsho, Michikazu

Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.831 - 834, 2021/10

The Ignitron is used in the clover device of the klystron power supply for RF acceleration in the J-PARC LINAC. However, this ignitron uses mercury, the use of which is restricted worldwide, and its production is expected to be discontinued in the future. Therefore, we designed a semiconductor clover switch for short-circuit protection of klystron using a MOS gate thyristor. We have manufactured an oval-type board module that realizes an operating output of 3 kV, 40 kA, and 50 $$mu$$s per board. For the control power supply to each board module assuming a high voltage of 120 kV, we adopted a self-power supply method that creates a control power supply with a high-voltage DCDC converter from the voltage shared and charged by each board module. It was possible to confirm the operating performance on a 1/4 scale (30 kV, 40 kA) against the voltage of the existing equipment (120 kV, 40 kA) by connecting ten oval board modules in series. The output test result will be reported.

Journal Articles

LTD semiconductor switch power supply for J-PARC kicker

Takayanagi, Tomohiro; Ono, Ayato; Horino, Koki*; Ueno, Tomoaki*; Sugita, Moe; Togashi, Tomohito; Yamamoto, Kazami; Kinsho, Michikazu

Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.53 - 57, 2021/10

We are developing the LTD semiconductor switch power supply, which combines SiC-MOSFET semiconductors and Linear Transformer Drivers (LTD) circuit to replace the kicker power supply in J-PARC. This power supply consists of two types of circuit boards: a main circuit board for forming rectangular pulses and a correction circuit board for compensating for flat-top droop, which enables high-voltage output and droop compensation for the number of stages connected in a hierarchical series. In addition to the main circuits of the thyratron, PFN, and end-clipper, which are the main circuit board is a single 400 mm $$times$$ 430 mm board with a reflected wave absorption circuit that can reduce the beam impedance from the kicker magnet. In this study, we used 32 main circuit boards with 1.7 kV SiC-MOSFETs and 20 compensation boards with 100V MOSFETs to achieve the required 40 kV output rating as a kicker power supply. The evaluation results will be reported.

JAEA Reports

Proposal of safe and secure maintenance method to realize long-term stable operation of electromagnet power supply

Ono, Ayato; Takayanagi, Tomohiro; Ueno, Tomoaki*; Horino, Koki*; Yamamoto, Kazami; Kinsho, Michikazu

JAEA-Technology 2021-005, 40 Pages, 2021/05

JAEA-Technology-2021-005.pdf:4.27MB

The 3-GeV rapid cycling synchrotron of Japan Proton Accelerator Research Complex (J-PARC) uses a large number of electromagnet power supplies in order to manipulate a high-intensity beam of 1 MW. These devices have been specially developed to meet the requirement to achieve acceleration of the 1-MW proton beams. State-of-the-art technologies are used to these devices. To achieve stable operation with few failures, and to prevent major troubles in the event of a failure, it is necessary to maintain the performance of the devices under the appropriate and accurate management strategy with an enough understanding of its characteristics. However, since the specification and function of each device is different respectively, and it is also produced by different manufacturer, we have to maintain adequately according to the structure, configuration and features of the apparatus. There are typically three major stages in the maintenance works. First, "Daily inspection" is constantly performed to monitor the status of the equipment during operation and check for any errors or abnormalities. Second, "Routine maintenance" is carried out weekly, monthly, or yearly to fix the errors, or to replace the parts that are deteriorated. Third, "Troubleshooting" is conducted to recover from sudden failures. In this report, we will introduce the specific contents of "Routine maintenance", "Daily inspection", and "trouble case" based on the experiences of the electromagnet power supply group. In particular, we will report the work management methods, including ideas for facilitating recovery work. We will also summarize the important points of a matter that does not depend on the configuration, structure, and characteristics of the equipment.

Journal Articles

Kicker power supply for J-PARC 3-GeV RCS with SiC-MOSFET

Takayanagi, Tomohiro; Ono, Ayato; Ueno, Tomoaki*; Horino, Koki*; Togashi, Tomohito; Yamamoto, Kazami; Kinsho, Michikazu; Koizumi, Isao*; Kawamata, Shunsuke*

JPS Conference Proceedings (Internet), 33, p.011020_1 - 011020_6, 2021/03

We are developing a new kicker power supply for J-PARC 3-GeV RCS (Rapid-Cycling Synchrotron) using the next generation power semiconductor SiC-MOSFET with high withstand voltage, low loss, and superior high frequency characteristics. The three major circuits adopted for the RCS kicker power supply, the thyratron switch, the PFN circuit of coaxial cable type, and the end clipper for reflection wave absorption, has been realized with a single modular circuit board based on the LTD circuit. The new kicker power supply realizes stable operation, miniaturization and energy saving by using power semiconductors. The required high voltage can be output by stacking the 800V/2kA modular circuit board in series. The details of circuit design and the results of achieving an output of half 20kV/2kA against the target specification of 40kV/2kA are presented here.

JAEA Reports

Construction of a design model for an electromagnet power supply with safety and reliability in the accelerator

Ono, Ayato; Takayanagi, Tomohiro; Ueno, Tomoaki*; Horino, Koki*; Yamamoto, Kazami; Kinsho, Michikazu

JAEA-Technology 2020-023, 40 Pages, 2021/02

JAEA-Technology-2020-023.pdf:2.98MB

The 3 GeV rapid cycling synchrotron of Japan Proton Accelerator Research Complex (J-PARC) uses a large number of electromagnet power supplies in order to generate a high-intensity beam of 1 MW. These devices have been specially developed to meet the required specifications of the proton beams. Ten years have passed since the 3 GeV synchrotron had started operation, and we need to replace and update of the components due to failures caused by the aging deterioration. Since the J-PARC is used by many users, it is quite important to recover as soon as possible when a trouble occurs. However, we often spend lots of time to investigate the status and cause of the problem, then it results in the delay of recovery work. One of the major reasons is due to the differences in the manufacturers of sensors and monitors. Therefore, we have to create a manual for each power supply and prepare some exclusive tools. However, troubles rarely occur in the same state and situation, so we have to rely on the experience and knowledge. Even for power supplies with different purposes and specifications, some components, such as sensors, can be shared in many cases. In addition, if the concept of the interlock system, for monitoring the status of the power supply and detecting malfunctions, is shared between the different power supplies, the method and response for failure investigation can be standardized. By using a device with good maintainability, the accelerator operation will be more stable and reliable. In this report, we introduce the necessity of sharing the design concept and common parts. We also explain the basic design model for safety and reliability, using an example of manufacturing an electromagnet power supply for the 3 GeV synchrotron.

Journal Articles

Semiconductor switch power supply for RCS kicker

Takayanagi, Tomohiro; Ono, Ayato; Horino, Koki*; Ueno, Tomoaki*; Togashi, Tomohito; Yamamoto, Kazami; Kinsho, Michikazu

Proceedings of 17th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.25 - 28, 2020/09

We have been developing a semiconductor switch power supply to replace the RCS kicker power supply in J-PARC. A SiC MOSFET is used as a power semiconductor element, and a radially symmetric LTD circuit is used for the circuit board. The power supply consists of a combination of two types of circuit boards: a main circuit board, which includes the circuits of the thyratron, PFN and end clipper provided in RCS kicker power supplies, on a single module board, and a correction board, which compensates for flat-top droop. A single main circuit board can provide 800V/2kA output, and 52 main circuit boards and 20 correction boards have been used to successfully achieve the high voltage of 40kV and flat-top flatness of less than $$pm$$0.2%. Furthermore, a preliminary test of the dual-parallel circuit was conducted for a twin kicker power supply configuration, which is required for the RCS kicker power supply. The evaluation results and prospects are presented.

Journal Articles

Development of ignitron alternative semiconductor switch for J-PARC accelerator

Ono, Ayato; Takayanagi, Tomohiro; Ueno, Tomoaki*; Horino, Koki*; Yamamoto, Kazami; Kinsho, Michikazu

Proceedings of 17th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.590 - 593, 2020/09

At J-PARC, an ignitron is used for the clover device of the klystron power supply for high-frequency acceleration of a linear accelerator. Ignitron uses mercury, which is of limited use worldwide, and is expected to be discontinued in the future. Therefore, a semiconductor switch for ignitron substitution using a MOS gate thyristor is designed. In order to be used as a crowbar device, a switch capable of resisting an operating output of 120 kV, 40 kA, 50 us is required. We have realized an oval type substrate module that achieves an operating output of 3 kV, 40 kA, 50 us per substrate. It was possible to confirm the operating performance on a 1/10 scale (12 kV, 40 kA) against the voltage of the existing equipment (120 kV, 40 kA) by connecting four oval board modules in series. The output test result will be reported.

Journal Articles

Development of pulse power supply for kicker using power semiconductor and alternative switch for ignitron

Takayanagi, Tomohiro; Ono, Ayato; Ueno, Tomoaki*; Horino, Koki*; Yamamoto, Kazami; Kinsho, Michikazu

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.75 - 79, 2019/07

We will replace the Thyratron and Ignitron discharge type switch with a semiconductor switch capable of more stable operation. The thyratron alternative switch used by the kicker power supply manufactured the radial symmetric module substrate of the 800V/2kA output which was built by LTD circuit using SiC-MOSFET. By making the power transfer structure between module substrates stacked for high voltage output into a coaxial ring type, a further reduction in inductance is realized. We report the results of evaluating a pulse output of 20kV/1kA (final specification is 40kV/2kA). Ignitron, which is used as a high-power klystron clover switch, has the potential to be discontinued in the future because it uses mercury, which has limited use worldwide. LINAC's klystron clover switches require a working output of 50kV at 120kV/40kA. We fabricated 3kV/40kA oval type module substrate using MOS gate thyristor. Report on preliminary test results.

Journal Articles

Development of ignitron alternative semiconductor switch and new kicker power supply for J-PARC accelerator

Ono, Ayato; Takayanagi, Tomohiro; Ueno, Tomoaki*; Horino, Koki*; Yamamoto, Kazami; Kinsho, Michikazu

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.399 - 403, 2019/07

J-PARC uses an ignitron switch as the klystron power source clover device and a thyratron switch as the kicker power system. Ignitron uses mercury, which is of limited use worldwide, and is expected to be discontinued in the future. Therefore, a semiconductor switch for ignitron substitution using a MOS gate thyristor is designed. In order to be used as a crowbar device, a switch capable of resisting an operating output of 120 kV, 40 kA, 50 us is required. We have realized an oval type substrate module that achieves an operating output of 3 kV, 40 kA, 50 us per substrate. In addition, we adopted a LTD circuit using SiC-MOSFET as an alternative switch for thyratron, and produced a radially symmetric pulse power supply circuit to which this circuit was applied. This circuit board achieves a rise of 250 ns or less, and a flat top of 1.5 us or more necessary for the RCS kicker power supply system, with a pulse output of 800 V and 2 kA per circuit board. We report on the power test results at 20 kV.

Journal Articles

Development of solid-state switch for power supply with SiC-MOSFET

Takayanagi, Tomohiro; Ueno, Tomoaki*; Horino, Koki*; Yamamoto, Kazami; Kinsho, Michikazu

Proceedings of 15th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.244 - 248, 2018/08

We will present the development of super high voltage short pulse switch power supply aiming at high performance of 3 GeV synchrotron accelerator pulsed electromagnet power supply. We are developing the switch power supply using SiC-MOSFET of the next generation power semiconductor which is higher in breakdown voltage, lower loss, and higher frequency operation than the current mainstream Si power semiconductors. The SiC conversion of semiconductors enables commercialization of thyratron substitute switches and power-saving small size switching power supplies. However, products that satisfy the specification of the thyratron (80kV/4kA) adopted for the J-PARC 3 GeV-RCS kicker power supply with one module have not been developed. Therefore, it is necessary to construct a circuit in which power semiconductors are multiplexed in series and parallel. In addition, the high-speed short pulse waveform required for the kicker power supply is designed with consideration of the circuit impedance such as inductance and stray capacitance separately from the performance improvement of the power semiconductor. Therefore, a circular radially symmetric circuit was constructed in which power semiconductors were concentrically arranged and the impedance of all parallel circuits could be made equal. As a result, waveform distortion caused by the difference in circuit impedance could be suppressed. This structure is adopted in the LTD circuit and it is indispensable for the development of semiconductor new kicker power supply. In this presentation, the results of the preliminary test and the evaluating test are reported.

Journal Articles

Improvement of high voltage rectifier of J-PARC klystron power supply

Chishiro, Etsuji; Sagawa, Ryu*; Toriyama, Minoru*

Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.400 - 402, 2016/11

Klystron power supplies in the J-PARC have been generated high voltage DC power by chopping 12-phase AC voltage power by thyristors, and boosting the voltage up to 110 kV in step-up transformer and rectifying the voltage in high voltage rectifiers. Some of the high voltage transformers (HVTR), which consist of the step-up transformer and the high voltage rectifier and the reactor, were often broken in the running time of over 30,000 hours. This failure caused the long-term shut down of the J-PARC facility. The high voltage rectifier composed diodes and condensers by a series connection of 66 stages. Investigation of the failed rectifier shows that the capacitors ware applied the overvoltage because the flashover occurred on the ceramic surface. We investigated the mechanisms applying the overvoltage and took measure for the overvoltage to the rectifier. The HVTR with the improved rectifier has been operating for long term to assess the modification effect.

Journal Articles

Precise current adjustment of the power supply for the injection painting magnets in the J-PARC RCS

Kato, Shinichi; Takayanagi, Tomohiro; Harada, Hiroyuki; Horino, Koki; Tobita, Norimitsu; Ueno, Tomoaki*; Kinsho, Michikazu

Proceedings of 12th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1180 - 1184, 2015/09

For the high intensity proton accelerator, the mitigation of the space charge force is most important because it causes the beam loss. For mitigation, the painting injection method which arranges the injection beam on the wide phase-space area during the multi-turn injection has been performed to expand the circulating beam in the J-PARC RCS. In the horizontal plane, the position and angle of the injection beam are fixed and these of the circulating beam are changed during the painting injection. Specifically, the time variation of the bump orbit height at the injection point is generated by the 4 paint bump magnet whose power supply are separate. Hence, the accuracy of the painting injection depend on the power conditioning precision of the magnet power supply. Therefore, the output characteristics of the power supply was examined for the precise power conditioning. In addition, the automatic conditioning tool has been developed based on that results.

Journal Articles

New injection bump power supply of the J-PARC RCS

Takayanagi, Tomohiro; Ueno, Tomoaki*; Horino, Koki; Tobita, Norimitsu; Hayashi, Naoki; Kinsho, Michikazu; Irie, Yoshiro*; Okabe, Kota; Tani, Norio; Naito, Shingo*; et al.

Proceedings of 12th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1169 - 1174, 2015/09

The new injection bump power supply for the shift bump magnet of the beam injection sub-systems at the J-PARC (Japan Proton Accelerator Research Complex) 3-GeV RCS (Rapid Cycling Synchrotron) has been developed and manufactured. The power capacity of the new power supply was more than doubled with the injection beam energy upgrading of the LINAC (Linear Accelerator) from 181 MeV to 400 MeV. Furthermore, the low ripple noise on the output current was required to prevent the resonance of the RF shield loop at the ceramic duct with the excitation magnetic field. The power supply newly adopted a capacitor commutation method to form the trapezoid waveform pattern (bump waveform). This paper reports characteristic about the new power supply.

129 (Records 1-20 displayed on this page)